FabEngineer Pro

FabEngineer Pro Quoting Lite

A connected, step-based quote builder for fabrication work. Enter your costs by stage, keep a live running total, and finish with a margin-based sell price and per-unit pricing.

1. Material

Raw material cost, scrap allowance, and quantity

$0.00
Use yield to account for drops and scrap. 85% means only 85% of purchased material becomes useful part material.

2. Cutting / Processing

Setup, runtime, machine rate, and per-part processing

$0.00

3. Welding

Weld metal, deposition, welding labor, and cleanup

$0.00
Multiply arc time to better reflect real labor time. Example: 2.0 means labor time is twice pure deposition time.

4. Labor & Overhead

Assembly, engineering, QA, overhead, and outside costs

$0.00

5. Sell Price

Target margin, sell price, and per-unit pricing

$0.00

Live Quote Summary

Material $0.00
Cutting / Processing $0.00
Welding $0.00
Labor & Overhead $0.00
Total Cost $0.00
Target Margin 0.00%
Sell Price $0.00
Sell Price / Unit $0.00

How This Works

Each step stores its own cost and feeds the summary automatically. That means this functions like one connected quote instead of a pile of separate calculators.
This lite version is best for:
• weldments
• fabricated assemblies
• laser / brake / weld work
• small to mid-size fab shop quotes